Work begins inside Saunterer to reveal the floors
Date: 26th June, 2015The floorboards are taken up.
This reveals the concrete used to add weight and keep water in the bilge accessible, which is also now removed…
… to reveal the timbers on either side of the keelson and the keelson itself.
The black iron floors, which spread the load of the upper end of the keel bolts, are also now more clearly visible, and will also be replaced with bronze as part of the Project.